Business

Lithium One Concludes Summer Drill Program with BEST INTERCEPTS TO DATE from James Bay Lithium Project, INCLUDING 64.0m of 1.65% Li2O and 45.5 of 1.80% Li2O

Lithium One Concludes Summer Drill Program with BEST INTERCEPTS TO DATE from James Bay Lithium Pr...

articleAmerican Lithium Corp.October 14, 20095/company/american-lithium/news/lithium-one-concludes-summer-drill-program-with-best-intercepts-to-date-from-james-bay-lithium-project-including-640m-of-165percent-li2o-and-455-of-180percent-li2o
Lithium One Concludes Summer Drill Program with BEST INTERCEPTS TO DATE from James Bay Lithium Project, INCLUDING 64.0m of 1.65% Li2O and 45.5 of 1.80% Li2O

About this update from American Lithium Corp.

[{"type":"text","content":"\nLithium One Concludes Summer Drill Program with BEST INTERCEPTS TO DATE from James Bay Lithium Project, INCLUDING 64.0m of 1.65% Li2O and 45.5 of 1.80% Li2O\n\n\n Oct. 14, 2009 (TheNewswire.ca) -- Lithium One Inc (the \"Company\")(TSX-V: LI), is pleased to report results from the final 22 out of 84 total holes of the Phase Two diamond drilling program at the James Bay Lithium Project. Highlights of the results include 64.0m of 1.65% Li2O, 57.9m of 1.66% Li2O, 45.5m of 1.80% Li2O, and 51.1m of 1.54% Li2O. A total of 46 intercepts longer than 5.0m with grades varying from 1.08% to 1.98% Li2O are included in this batch of results, among which, thirty-one are more than ten metres. The weighted average grade of significant intercepts reported during this program is 1.56% Li2O. All pegmatite intercepts greater than five metres from the final 22 holes are summarized in Table 1 below.Table 1. Phase 2 Drilling Results, October 7th to October 14th, 2009(Drill Intercepts > 5 metres, cut-off grade 0.8% Li2O)\nHole From (m) To (m) Width (m) Li2O (%) \nJBL09-66 107.67 171.67 64.0 1.65 \nJBL09-65 41.95 99.87 57.9 1.66 \nIncluding 46.45 50.95 4.5 2.18 \nJBL09-80 44.50 90.00 45.5 1.80 \nIncluding 52.00 55.00 3.0 2.99 \n& Including 65.40 74.40 9.0 2.62 \nJBL09-74 67.67 118.80 51.1 1.54 \nIncluding 74.67 79.17 4.5 2.50 \nJBL09-67 133.70 171.00 37.3 1.84 \nIncluding 139.70 144.20 4.5 3.04 \n& Including 157.70 162.20 4.5 2.43 \nJBL09-62 102.57 143.40 40.8 1.60 \nIncluding 119.07 126.57 7.5 2.22 \nJBL09-76 19.24 58.05 38.8 1.56 \nJBL09-72 90.44 128.80 38.4 1.45 \nIncluding 109.94 114.44 4.5 2.14 \nJBL09-63 47.60 83.00 35.4 1.56 \nJBL09-75 23.28 56.78 33.5 1.53 \nJBL09-65 242.75 271.35 28.6 1.68 \nJBL09-67 29.64 53.00 23.4 1.98 \nJBL09-62 61.07 87.45 26.4 1.53 \nTable 1. Cont'd \nHole From (m) To (m) Width (m) Li2O (%) \nJBL09-82 91.84 117.15 25.3 1.52 \nJBL09-64 10.60 36.30 25.7 1.44 \nJBL09-73 31.45 55.15 23.7 1.47 \nJBL09-65 110.68 132.46 21.8 1.57 \nJBL09-79 38.48 58.68 20.2 1.69 \nIncluding 54.48 58.68 4.2 2.87 \nJBL09-84 113.88 134.67 20.8 1.60 \nJBL09-78 16.20 35.20 19.0 1.52 \nJBL09-83 42.65 61.35 18.7 1.49 \nJBL09-76 112.48 129.58 17.1 1.53 \nJBL09-82 142.54 157.80 15.3 1.46 \nJBL09-65 134.06 148.02 14.0 1.60 \nJBL09-81 124.95 138.64 13.7 1.59 \nJBL09-74 3.20 16.70 13.5 1.60 \nJBL09-78 67.78 81.60 13.8 1.38 \nIncluding 70.28 73.28 3.0 2.48 ...

More updates from American Lithium Corp.