Business
American Lithium Launches Comprehensive Drill Campaign in Fish Lake Valley Lithium Brine Project, Nevada
American Lithium Launches Comprehensive Drill Campaign in Fish Lake Valley Lithium Brine P...

About this update from American Lithium Corp.
[{"type":"text","content":"\n\n\n\n\nAmerican Lithium Launches Comprehensive Drill Campaign in Fish Lake Valley Lithium Brine Project, Nevada\n\n/* Style Definitions */\nspan.prnews_span\n{\nfont-size:8pt;\nfont-family:\"Arial\";\ncolor:black;\n}\na.prnews_a\n{\ncolor:blue;\n}\nli.prnews_li\n{\nfont-size:8pt;\nfont-family:\"Arial\";\ncolor:black;\n}\np.prnews_p\n{\nfont-size:0.62em;\nfont-family:\"Arial\";\ncolor:black;\nmargin:0in;\n}\n\n\n\n\n\n\nAmerican Lithium Launches Comprehensive Drill Campaign in Fish Lake Valley Lithium Brine Project, Nevada\nCanada NewsWire\nVANCOUVER, June 22, 2016\n\n\n\n\n13 hole RC drilling in North Bowl Playa to evaluate stratigraphy, conduct brine chemistry analyses and determine preliminary well hydrology parameters such as permeability and transmissivity; \nBrine sampling program in South Bowl Playa to determine accumulated levels of lithium, boron, potassium and magnesium; \nUpdating proprietary geophysical gravity model for Fish Lake Valley.\n\n\n\nVANCOUVER, June 22, 2016 /CNW/ - American Lithium Corp. (TSXV: Li) (OTCQB: LiACF) (Frankfurt: 5LA; WKN: A2AHEL) (\"American Lithium\" or the \"Company\"), is pleased to announce that upon completion of its initial site reconnaissance, the Company has issued notice to proceed to its geological subcontractors to mobilize its fully funded, Phase 2 Exploration and Development Program for both deep and shallow drill and auger programs in the North and South Bowl playas. The playas comprise the Company's contiguous 18,552 acre Fish Lake Valley lithium brine portfolio located in Esmeralda County, Nevada.  \n\nUnder the direction of Dana Brock, P.E., R.G., C.E.G., Vice President, Geosciences and Engineering, American Lithium is planning a Phase 2 Exploration Program of up to thirteen (13) drill sites to a maximum of 150 m in depth to complete the previous 200 m grid sampling program in the Company's North Bowl Playa shallow prospect conducted from 2009 to 2015 (see the Company's news release dated June 1, 2016).  The thirteen (13) drill sites have been selected at specific locations in the Fish Lake Valley North Bowl Playa, based on previously collected surface screening data, detailed structural geology and nearby local mineralization. Each site will be explored by direct push method to refusal, which is typically 60 m or less. Brine samples will...