Business
American Lithium announces grades from 25 to 389 mg/L Li and 58 to 2210 mg/L B from lithium brine extracted from 6 Auger Drill Holes at the Fish Lake Valley Lithium Brine Project, Nevada
American Lithium announces grades from 25 to 389 mg/L Li and 58 to 2210 mg/L B from lithiu...

About this update from American Lithium Corp.
[{"type":"text","content":"\n\n\n\nAmerican Lithium announces grades from 25 to 389 mg/L Li and 58 to 2210 mg/L B from lithium brine extracted from 6 Auger Drill Holes at the Fish Lake Valley Lithium Brine Project, Nevada\n\n/* Style Definitions */\nspan.prnews_span\n{\nfont-size:8pt;\nfont-family:\"Arial\";\ncolor:black;\n}\na.prnews_a\n{\ncolor:blue;\n}\nli.prnews_li\n{\nfont-size:8pt;\nfont-family:\"Arial\";\ncolor:black;\n}\np.prnews_p\n{\nfont-size:0.62em;\nfont-family:\"Arial\";\ncolor:black;\nmargin:0in;\n}\n.prngen2{\nBORDER-BOTTOM:black 1pt solid; TEXT-ALIGN: LEFT; BORDER-LEFT:black 1pt solid; PADDING-LEFT:0.50em; PADDING-RIGHT:0.50em; VERTICAL-ALIGN: TOP; BORDER-TOP:black 1pt solid; BORDER-RIGHT:black 1pt solid\n}\n.prntbls{\nBORDER-BOTTOM: black 1px solid; BORDER-LEFT: black 1px solid; BORDER-COLLAPSE: collapse; BORDER-TOP: black 1px solid; BORDER-RIGHT: black 1px solid\n}\n\n\n\n\n\n\nAmerican Lithium announces grades from 25 to 389 mg/L Li and 58 to 2210 mg/L B from lithium brine extracted from 6 Auger Drill Holes at the Fish Lake Valley Lithium Brine Project, Nevada\nCanada NewsWire\nVANCOUVER, Aug. 11, 2016\n\n\n\nVANCOUVER, Aug. 11, 2016 /CNW/ - American Lithium Corp. (TSXV: Li) (OTCQB: LiACF) (Frankfurt: 5LA; WKN: A2AHEL) (\"American Lithium\" or the \"Company\"), has received assays from the recently completed 6 initial shallow (2 m) auger drill holes on the North Bowl Playa in its Fish Lake Valley lithium brine project, Esmeralda County, Nevada.  Assays of the samples returned lithium values from 25 to 389 mg/L Lithium and 58 to 2210 mg/L Boron (see table below).\n\n\n\n\nElement\n\n\nLi\n\n\nB \n\n\nMg\n\n\n\nReporting unit:\n\n\nmg/L\n\n\nmg/L\n\n\nmg/L\n\n\n\nAA\n\n\n389\n\n\n2210\n\n\n0.6\n\n\n\nBB\n\n\n321\n\n\n1340\n\n\n0.3\n\n\n\nCC\n\n\n99\n\n\n205\n\n\n1.9\n\n\n\nEEE\n\n\n39\n\n\n58\n\n\n96.9\n\n\n\nJJ\n\n\n37\n\n\n113\n\n\n27.8\n\n\n\nNN\n\n\n25\n\n\n65\n\n\n34.8\n\nNorth Playa Fish Lake Valley Auger Drilling Lithium Brine samples\n\nThe auger drill holes targeted infill drilling in areas of interest from the 2010-11 Phase I exploration as well as extensions of these areas.  These results show increased lithium brine grades from the Phase I program which reported maximum values of 150 mg/L Lithium and 2670 mg/L Boron, (NI 43-101 Technical Report, Fish Lake Valley Lithium-Brine Property, Esmeralda County, Ne...