Business
Amentum Delivers Advanced Engineering for Key Artemis II Launch Rehearsal
CHANTILLY, Va., December 29, 2025--Amentum (NYSE: AMTM) delivered advanced end-to-end ground systems engineering for a key Artemis II launch rehearsal at the Kennedy Space Center on December 20. The Countdown Demonstration Test (CDDT) simulated launch day operations for the integrated Orion spacecraft and Space Launch System (SLS). During the Artemis II mission, Orion will carry four astronauts on an approximately 10-day journey around the Moon and back. It will be propelled by the SLS, the most
About this update from Amentum Holdings, Inc.
[{"type":"image","alt":"Artemis II crew L-R: Mission Specialist Jeremy Hansen, Pilot Victor Glover, Commander Reid Wiseman, and Mission Specialist Christina Koch","displaySize":"","headline":null,"caption":"Artemis II crew L-R: Mission Specialist Jeremy Hansen, Pilot Victor Glover, Commander Reid Wiseman, and Mission Specialist Christina Koch","credit":null,"className":"","disableSlideshowImg":false,"size":{"original":{"width":480,"height":320,"url":"https://media.zenfs.com/en/business-wire.com/483fb36ccc676c5986714574c89322c9"},"resized":{"url":"https://s.yimg.com/ny/api/res/1.2/qw2YD0BggsRVrmYMIjlrkA--/YXBwaWQ9aGlnaGxhbmRlcjt3PTk2MDtoPTY0MDtjZj13ZWJw/https://media.zenfs.com/en/business-wire.com/483fb36ccc676c5986714574c89322c9","width":480,"height":320}},"lazy":false},{"type":"image","alt":"","displaySize":"","headline":null,"caption":"","credit":null,"className":"","disableSlideshowImg":false,"size":{"original":{"width":2596,"height":804,"url":"https://media.zenfs.com/en/business-wire.com/5fe9e24e95518dd6ea36cfd962d5ef0f"},"resized":{"url":"https://s.yimg.com/ny/api/res/1.2/ei0A4gyTNeMj2OAU0JTMGA--/YXBwaWQ9aGlnaGxhbmRlcjt3PTk2MDtoPTI5NztjZj13ZWJw/https://media.zenfs.com/en/business-wire.com/5fe9e24e95518dd6ea36cfd962d5ef0f","width":960,"height":297},"lightbox":{"url":"https://s.yimg.com/ny/api/res/1.2/T.bFu52eUyOKuN80giEVYw--/YXBwaWQ9aGlnaGxhbmRlcjt3PTI0MDA7aD03NDQ7Y2Y9d2VicA--/https://media.zenfs.com/en/business-wire.com/5fe9e24e95518dd6ea36cfd962d5ef0f","width":1200,"height":372}}},{"type":"text","content":"Company Powers NASA’s Countdown Demonstration Test at the Kennedy Space Center","length":78,"tagName":"p","attribs":{}},{"type":"text","content":"CHANTILLY, Va., December 29, 2025--(BUSINESS WIRE)--Amentum (NYSE: AMTM) delivered advanced end-to-end ground systems engineering for a key Artemis II launch rehearsal at the Kennedy Space Center on December 20. The Countdown Demonstration Test (CDDT) simulated launch day operations for the integrated Orion spacecraft and Space Launch System (SLS). During the Artemis II mission, Orion will carry four astronauts on an approximately 10-day journey around the Moon and back. It will be propelled by the SLS, the most powerful and capable rocket NASA has ever built.","length":566,"tagName":"p"},{"type":"text","content":""As the first crewed mission on NASA's path to establishing a long-term presence o...