Business
The EPSO-G group of companies announces its consolidated audited operating and financial results for 2025
The new energy group EPSO-G (company code 302826889, registered office address: Laisvės pr. 10, Vilnius, Lithuania) On 17 March 2026, the Board of EPSO-G approved the EPSO-G Group’s integrated annual report for 2025. Financial results The EPSO-G Group’s adjusted net profit remained stable at EUR 42 million (EUR 41.9 million in 2024). Adjusted EBITDA, calculated after eliminating temporary regulatory differences and excluding non-recurring items, amounted to EUR 76.7 million, representing a 5% in
About this update from Amber Grid Ab
[{"type":"image","alt":"EPSO-G UAB","displaySize":"","headline":null,"caption":"EPSO-G UAB","className":"","disableSlideshowImg":false,"size":{"original":{"width":300,"height":136,"url":"https://media.zenfs.com/en/globenewswire.com/955128b630989d439e872fd5063871b3"},"resized":{"url":"https://s.yimg.com/ny/api/res/1.2/hxhzh8Auxr6Bx4b413ryDQ--/YXBwaWQ9aGlnaGxhbmRlcjt3PTQyMDtoPTE5MDtjZj13ZWJw/https://media.zenfs.com/en/globenewswire.com/955128b630989d439e872fd5063871b3","width":300,"height":136}},"lazy":false},{"type":"text","content":"The new energy group EPSO-G (company code 302826889, registered office address: Laisvės pr. 10, Vilnius, Lithuania)","length":115,"tagName":"p"},{"type":"text","content":"On 17 March 2026, the Board of EPSO-G approved the EPSO-G Group’s integrated annual report for 2025.","length":100,"tagName":"p"},{"type":"text","content":"Financial results","length":17,"tagName":"p"},{"type":"text","content":"The EPSO-G Group’s adjusted net profit remained stable at EUR 42 million (EUR 41.9 million in 2024).","length":100,"tagName":"p"},{"type":"text","content":"Adjusted EBITDA, calculated after eliminating temporary regulatory differences and excluding non-recurring items, amounted to EUR 76.7 million, representing a 5% increase year-on-year (EUR 73 million in 2024).","length":209,"tagName":"p"},{"type":"text","content":"The Group invested EUR 211.1 million in infrastructure, which is nearly 11% less than in 2024. Investments by Litgrid totalled almost EUR 188 million, while Amber Grid invested nearly EUR 22 million.","length":199,"tagName":"p"},{"type":"text","content":"EPSO-G Invest allocated EUR 73.1 million to the defence sector by acquiring shares in Rheinmetall Defence Lietuva. These funds were contributed by EPSO-G and Valstybės investicinis kapitalas.","length":191,"tagName":"p"},{"type":"text","content":"Adjusted ROE (last 12 months) reached 10.6% in 2025 (12.5% in 2024).Projects and key events","length":92,"tagName":"p"},{"type":"text","content":"On 9 February, the Baltic electricity systems were successfully synchronised with the continental European networks. All infrastructure projects under the Synchronisation Programme were completed, except for the Harmony Link land-based interconnector, which resumed in 2024.","length":274,"tagName":"p"},{"type":"text","content":"On 13 October, Amber Grid and EEX finalised the sale of GET ...