Business

Amarc and Freeport Continue Expanding High Grade Aurora Copper-Gold-Silver Deposit

Deposit Remains Open - Further Assays Pending VANCOUVER, BC / ACCESS Newswire / December 10, 2025 / Amarc Resources Ltd. ("Amarc" or the "Company") (TSXV:AHR...

articleAmarc Resources Ltd.December 10, 202512/company/amarc-resources-ltd/news/amarc-freeport-continue-expanding-high-124500380
Amarc and Freeport Continue Expanding High Grade Aurora Copper-Gold-Silver Deposit

About this update from Amarc Resources Ltd.

[{"type":"text","content":"Deposit Remains Open - Further Assays Pending","length":45,"tagName":"p"},{"type":"text","content":"VANCOUVER, BC / ACCESS Newswire / December 10, 2025 / Amarc Resources Ltd. ("Amarc" or the "Company") (TSXV:AHR)(OTCQB:AXREF) is pleased to announce additional assay results from the 2025 JOY District drill program. The completed 2025 drill program was primarily focused on continuing to define the full extent of the AuRORA Deposit discovered later in 2024. The AuRORA Deposit hosts high grade near surface, copper-gold-silver ("Cu-Au-Ag") mineralization with exceptional vertical and lateral continuity (see Amarc releases January 17, 20 and February 28, 2025) and remains open to further expansion to the north, east and west. Amarc believes the rare contribution of grade, geometry and emerging scale of AuRORA indicates it has the hallmarks of a Tier One asset in the making.","length":810,"tagName":"p"},{"type":"text","content":"Twenty-four core holes (9,687 m) were completed at the AuRORA Deposit in 2025; 23 of these are expansion step-out holes drilled over an area measuring some 1 km by 1 km. Host rocks, alteration and mineralization remain consistent with that encountered in the 2024 AuRORA discovery drill holes.","length":293,"tagName":"p"},{"type":"text","content":"Results announced in November from six holes completed on Sections 8000N and 8100N successfully expanded AuRORA +200 m to the north (see Amarc release October 22, 2025). Today, we are announcing two drill holes (JP25103, JP25109) located on Section 8200N, which have expanded AuRORA a further +100 m to the north (Figures 1, 2, 3 and 4, and Tables 1 and 2).","length":357,"tagName":"p"},{"type":"text","content":"In addition, assay results are also being released for two new holes completed on Section 7900N (JP25093 and JP25107) which expand the deposit approximately 200 m to the east (Figures 1 and 5, and Tables 1 and 2). Today's results also include the balance of hole JP25098 on Section 7600N (partially announced in September) that expanded the deposit approximately 300 m to the southeast (see Figures 1 and 6 and Tables 1 and 2). Assay results from four 2025 step-out holes on this section are still pending.","length":510,"tagName":"p"},{"type":"text","content":"Highlights from Drill Holes Located on Sections 7900N and 8200N at AuRORA In...

More updates from Amarc Resources Ltd.

Amarc Resources Ltd.DepositAmarc Resources