Business
Altamira Gold Corp. announces commencement of drill program at Cajueiro Project, Brazil
Altamira Gold Corp. announces commencement of drill program at Cajueiro Project, ...

About this update from Altamira Gold Corp
[{"type":"text","content":"Altamira Gold Corp. announces commencement of drill program at Cajueiro Project, Brazil \n\t\t\tbody { font-size: 11pt;\n\t\t\t}\n\n\t\t\t.nr-sub-head ul,\n\t\t\t.nr-body ul {\n\t\t\t\tlist-style-type: disc !important;\n\t\t\t\tmargin-left: 2em !important;\n\t\t\t}\n\n\t\t\t.nr-sub-head ol,\n\t\t\t.nr-body ol {\n\t\t\t\tmargin-left: 2em !important;\n\t\t\t}\n\n\t\t\t.nr-body p, .nr-body {margin-bottom: 0px !important;\n\t\t\t\t\tmargin-top: 0px !important;\n\t\t\t\t\t-webkit-margin-before: 0px !important;\n\t\t\t\t\t-webkit-margin-after: 0px !important;\n\t\t\t\t\tfont-family: Arial !important;\n\t\t\t\t\tfont-size: 11pt !important;\n\t\t\t }\n\n\t\t\ttbody {\n\t\t\t\tborder-top: 0;\n\t\t\t}\n\n\t\t\t H1 {font-weight: bold;\n\t\t\t\tfont-size: 16pt;\n\t\t\t }\n\n\t\t\t H2 {font-weight: bold;\n\t\t\t\tfont-size: 12pt;\n\t\t\t }\n\n\t\t\t H3 {font-weight: bold;\n\t\t\t\tfont-size: 11pt;\n\t\t\t }\n\n\n\t\t\t H1.nr-head {\n\t\t\t \t\tfont-family: Trebuchet MS !important;\n\t\t\t \t\tfont-size: 16pt !important;\n\t\t\t \t\tcolor: #3D86C6 !important;\n\t\t\t \t\tfont-weight:bold !important;\n\t\t\t \t\ttext-align:center !important;\n\n\t\t\t }\n\n\t\t\t H2.nr-sub-head {font-weight: bold !important;\n\t\t\t \t\tdisplay: block !important;\n\t\t\t \t\ttext-align: start !important;\n\t\t\t \t\tfont-family: Arial !important;\n\t\t\t\t\tfont-size: 12pt !important;\n\t\t\t }\n\n\t\t\t .nr-body a { font-size: 11pt !important;\n\t\t\t }\n\n\t\t\t TABLE { width: auto!important;\n\t\t\t }\n\n\t\t Altamira Gold Corp. announces commencement of drill program at Cajueiro Project, Brazil\n Vancouver, BC (FSCwire) - Altamira Gold Corp. (TSXV: ALTA) (FSE: T6UP) (USA: EQTRF), formerly Equitas Resources Corp. (“Altamira” or the “Company”) is pleased to announce that it has commenced the planned program of drilling at the Cajueiro project located in western Brazil.\n\n \n\nA series of diamond drill holes are planned on several soil anomalies at Cajuiero in the Baldo and Morro Verde target areas which together constitute the bulk of the existing resource (as detailed below). The current drill program will be directed outside of the current resource in an effort to track down the source of those gold-in-soil anomalies and expand the current NI 43-101 resource.\n\n \n\nDrilling rig on location at Cajueiro:\n\n\n\nTo vie...