Business
Anatolia announces additional positive Çöpler drilling results
Anatolia announces additional positive Çöpler drilling results

About this update from Allied Strategic Resources Corp
[{"type":"text","content":"\n\n\n\nFeb. 10, 2010 (Canada NewsWire Group) -- TORONTO, Feb. 10 /CNW/ -- Anatolia Minerals Development Limited (\"Anatolia\" or the \"Company\") (TSX:ANO) announces additional results from the current sulfide exploration program at the Çöpler Gold Project. A map is posted to Anatolia's website (www.anatoliaminerals.com). This is the third release of results for this program, with previous announcements made November 17 and December 7, 2009.The majority of the reported drill holes are in the Main Zone, trending from southwest to northeast through the center of the planned pit for the oxide phase. Sulfide intercepts were generally below the planned oxide pit and are expected to add tonnes to the sulfide resource. True widths in the Main Zone are not determinable at this time based on the available data. A summary of the results is given below:Inter-Drill Depth From To cept Au AgHole (Meters) Location (Meters) (Meters) (Meters) (gpt) (gpt) NotesCDD-205 387.9 Mn Mine 14.00 32.90 18.90 4.70 10.0 Oxide173.50 194.00 20.50 2.95 10.8 SulfideCDD-206 278.5 Main 93.00 130.00 37.00 2.65 10.7 Sulfide(lessthan)CDD-208 146.6 Main 98.50 108.50 10.00 3.05 1.0 SulfideCDD-211 236.6 Main 5.50 8.50 3.00 4.36 7.4 Oxide27.50 78.50 51.00 2.51 5.0 SulfideIncluding 31.50 43.80 12.30 5.74 8.0 SulfideIncluding 54.40 58.00 3.60 3.89 7.4 SulfideIncluding 62.00 65.50 3.50 3.33 5.0 SulfideCDD-212 237.9 Main 124.50 140.00 15.50 2.02 1.8 Sulfide144.60 160.50 15.90 3.02 5.7 SulfideCDD-213 253.3 Main 122.50 166.00 43.50 2.05 2.0 Sulfide(lessthan)Including 123.50 138.00 14.50 3.11 1.0 SulfideIncluding 142.90 146.10 3.20 2.96 1.7 SulfideCDD-215 240.0 Main 5.90 17.00 11.10 3.17 5.5 Oxide77.70 94.50 16.80 3.00 2.5 SulfideCDD-216 270.3 Main 24.60 38.70 14.10 2.26 1.9 Sulfide48.50 56.00 7.50 2.21 8.0 SulfideCDD-217 197.0 Main 164.30 169.90 5.60 7.18 3.9 SulfideCDD-218 150.3 Main 21.20 25.20 4.00 2.83 4.9 Sulfide46.50 51.00 4.50 2.82 22.3 Sulfide57.10 86.00 28.90 2.84 4.2 Sulfide104.80 115.05 10.25 10.97 63.4 SulfideCRD-715 204.0 Main 13.00 15.00 2.00 3.68 199.5 Sulfide18.00 44.00 26.00 3.29 13.7 Sulfide62.00 77.00 15.00 3.15 30.3 Sulfide129.00 142.50 13.50 2.59 3.6 SulfideUnreported holes CDD-207, CDD-209, CDD-210, CDD-214, CRD-714 and CRD-716 had no significant results.The current phase of drilling was completed in late January with final assay results pendi...