Business
Three Copper-Gold Drill Targets at Donovan 2
Three Copper-Gold Drill Targets at Donovan 2.

About this update from Alien Metals Ltd
[{"type":"text","content":"\n \n \n RNS Number : 3887V\n Alien Metals Limited\n 06 August 2020\n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n Trading Symbols\n \n \n AIM: UFO\n \n \n FWB: I3A1\n \n \n 6th August 2020\n \n \n \n \n \n \n Alien Metals Ltd \n \n \n \n \n (\"Alien Metals\" or \"the Company\")\n \n \n \n \n \n \n \n \n \n Link to full announcement including figures:\n \n \n \n \n http://www.rns-pdf.londonstockexchange.com/rns/3887V_1-2020-8-6.pdf\n \n \n \n \n \n \n \n \n Three Copper-Gold Drill Targets identified at Donovan 2 \n \n \n \n \n \n \n Alien Metals Ltd (LSE AIM:UFO) (\"Alien Metals\" or \"the Company\"), a minerals exploration and development company, is pleased to announce, following its last update of 20th July 2020, the details of its maiden exploration drilling program on the Donovan 2 Copper Gold Volcanic Massive Sulphide (VMS) project in Mexico.\n \n \n \n \n \n Highlights:\n \n \n - \n Three targets defined for a maiden drilling program at Donovan 2\n \n \n - \n Two geophysical targets at Cerro de la Cruz with coincident geological features within a broad well-defined corridor\n \n \n - \n One geological target with proven copper mineralisation from shallow historic underground workings and adjacent water hole samples at Los Alomos\n \n \n - \n Targets identified by Alien Metals technical team and supporting world class geophysical consultants\n \n \n - \n All targets are robust and require drilling to develop the project\n \n \n - \n Six drill holes planned for 1,000 metres of drilling \n \n \n - \n Work to commence as soon as possible\n \n \n \n \n \n Bill Brodie Good, Technical Director of Alien Metals, commented: \n \n \n \"We have extensively reviewed all available data including some reinterpretation work as well as using one of our consultants experience and knowledge of the San Nicolas VMS deposit just down the road to lead us to this maiden drilling program which we feel now provides us with some exciting targets. The company will work as efficiently as possible to update the existing drill permission documentation and work to get the drilling started as soon as is safely possible under the current situation.\"\n \n \n \n \n \n The Donovan 2 project is situated in a flat-lying area located...