Business

Clogau Gold Mine: Update on Work Activities

Clogau Gold Mine: Update on Work Activities.

articleAlba Mineral Resources PlcNovember 3, 20203/company/alba-mineral-resources/news/clogau-gold-mine-update-on-work-activities
Clogau Gold Mine: Update on Work Activities

About this update from Alba Mineral Resources Plc

[{"type":"text","content":"\n \n \n \n RNS Number : 0944E\n Alba Mineral Resources PLC\n 03 November 2020\n  \n \n \n \n Click on or paste the following link into your website browser to view the associated PDF document (including maps and images): \n \n \n http://www.rns-pdf.londonstockexchange.com/rns/0944E_1-2020-11-3.pdf\n \n \n \n \n  \n \n \n Alba Mineral Resources plc\n \n \n  \n \n \n (\"Alba\" or the \"Company\")\n \n \n  \n \n \n Completion of Underground Exploration Phase at \n \n \n Clogau-St David's Gold Mine and Commencement of Surface Drilling Campaign\n \n \n  \n \n \n Alba Mineral Resources plc (AIM: ALBA) is pleased to provide an update on the Company's work activities at the Clogau-St David's Gold Mine.  \n \n \n  \n \n \n Key Points\n \n \n · \n Underground drilling programme successfully completed, with seven drill holes completed for a total of 559.5 metres\n \n \n · \n Underground bulk sampling programme successfully completed, with seven bulk samples collected for a total of 36 tonnes of material\n \n \n · \n Surface drilling campaign has commenced\n \n \n  \n \n \n Alba's Executive Chairman, George Frangeskides, commented: \n \n \n \"We are delighted to have successfully concluded our 2020 underground drilling and bulk sampling programme.  I would like to thank our underground teams for their skill, dedication and hard work.  We now move straight into our surface drilling campaign.  The surface drill rig is on site and our team has started collaring the first hole.\"\n \n \n  \n \n \n Underground Drilling\n \n \n Alba has successfully completed its underground drilling programme, with seven drill holes completed for a total of 559.5 metres of drilling (see Figure 1 in the PDF version of this announcement, which also shows the length of each completed hole). This includes two drill holes (L003 and L004) completed since the Company's last announcement on 21 October 2020.\n \n \n  \n \n \n Bulk Sampling Programme\n \n  \n \n Alba has successfully completed its underground bulk sampling programme, with seven bulk samples taken for a total of 36 tonnes of material (see Figure 2 in the PDF version of this announcement, which also shows the total mass of each bulk sample).\n \n \n  \n \n \n Surface Drilling Programme Commences\n \n \n  \n \n \n Our contr...

More updates from Alba Mineral Resources Plc