Business

AMD and Hammer Distribution Target UK's AI "Power Wall" with New CPU-First Infrastructure Strategy

In the race to build the future of AI, and the shift to inferencing, the industry is at risk of overlooking a critical component: the CPU. Today, Hammer Distribution and AMD are pivoting to a 'CPU-first' strategy not just as a technical choice, but as a survival tactic for UK businesses trapped in the 'time-to-power' crisis. This partnership aims to prove that the secret to unlocking AI isn't more power, but better management of the power we already have.

articleAdvanced Micro Devices IncMarch 25, 20263/company/advanced-micro-devices-inc/news/amd-and-hammer-distribution-target-uks-ai-power-wall-with-new-cpu-first-infrastructure-strategy
AMD and Hammer Distribution Target UK's AI "Power Wall" with New CPU-First Infrastructure Strategy

About this update from Advanced Micro Devices Inc

[{"type":"list","items":[{"val":[{"type":"text","content":"Grid connection queues identified as the "single biggest blocker" to UK AI expansion.","length":95,"tagName":"p"}]},{"val":[{"type":"text","content":"New regulatory reforms from Ofgem and NESO prioritize "ready" and "strategically aligned" data centres.","length":123,"tagName":"p"}]},{"val":[{"type":"text","content":"AMD EPYC™ processors positioned as the critical lever for "useful work per watt" in power-constrained environments.","length":125,"tagName":"p"}]}],"tagName":"ul","bulletedList":true,"length":343,"olType":false},{"type":"text","content":"LONDON, March 25, 2026 /PRNewswire/ -- In the race to build the future of AI, and the shift to inferencing, the industry is at risk of overlooking a critical component: the CPU. Today, Hammer Distribution and AMD are pivoting to a 'CPU-first' strategy not just as a technical choice, but as a survival tactic for UK businesses trapped in the 'time-to-power' crisis. This partnership aims to prove that the secret to unlocking AI isn't more power, but better management of the power we already have.","length":523,"tagName":"p"},{"type":"image","alt":"AMD and Hammer Distribution Target UK’s AI “Power Wall” with New CPU-First Infrastructure Strategy","displaySize":"","headline":null,"caption":"AMD and Hammer Distribution Target UK’s AI “Power Wall” with New CPU-First Infrastructure Strategy","className":"","disableSlideshowImg":false,"size":{"original":{"width":400,"height":400,"url":"https://media.zenfs.com/en/prnewswire.com/be7ad683717f01d6daae4f9d7f4f2e61"},"resized":{"url":"https://s.yimg.com/ny/api/res/1.2/AdrhAPJTOL0sFaMkfsdoLw--/YXBwaWQ9aGlnaGxhbmRlcjt3PTcwNTtoPTcwNQ--/https://media.zenfs.com/en/prnewswire.com/be7ad683717f01d6daae4f9d7f4f2e61","width":400,"height":400}},"href":"https://mma.prnewswire.com/media/2941456/Hammer.html","hrefExternal":true,"rel":"nofollow"},{"type":"text","content":"As global compute demand is projected to rise 100x over the next five years, the UK's AI ambitions are hitting a physical limit. Recent government papers and regulatory decisions from Ofgem and the National Energy System Operator (NESO) have confirmed that grid capacity is now the primary bottleneck for data centre expansion. Under the new December 2025 reforms, &...

More updates from Advanced Micro Devices Inc

data centresHammerregulatory reformsOfgemUKprocessorscritical component