Business
Goldseek Resources Intersects 4.92 G/T Gold over 28.65 Meters at Beschefer
Highlights: 4.92 g/t gold over 28.65 meters (141 Metal Factor), including 11.39 g/t gold over 9.1 meters, is the 2nd best intercept on the Property to date in t

About this update from Abitibi Metals Corp
[{"type":"text","content":"Highlights: 4.92 g/t gold over 28.65 meters (141 Metal Factor), including 11.39 g/t gold over 9.1 meters, is the 2nd best intercept on the Property to date in terms of grade and thickness. Rushed intervals from 7 of 18 holes completed during Goldseek’s maiden 5,000-meter program All holes returned gold values supporting the continuity of the B14 gold-bearing structure Base metals potential on intercepts is still to be determined based on alteration indicators and copper sulfide occurrences. London, Ontario – TheNewswire - October 6, 2021 – Goldseek Resources Inc. (CSE:GSK) (CNSX:GSK.CN) (FSE:4KG) (“Goldseek” or the “Company”) is pleased to announce results from the first seven drill holes at the Beschefer Project, located approximately 30 kilometers southwest of Wallbridge’s Fenelon Gold Project on the Detour Gold Trend. BE-21-02 intersected 4.92 g/t Au over 28.65 meters, including 11.39 g/t Au over 9.1 meters, making this the second-best intercept by metal factor (grade X thickness) in the Project’s history. This was only the rushed portion of the hole, which started and ended with gold values of respectively 2.2 g/t and 9.5 g/t. The drill grid was designed to cut the Central Shallow Zone, where mineralization extends from the bedrock interface down to a vertical depth of about 200 metres. The target structure dips at 40° to the southeast. Holes reported aimed at defining the gold grade envelope using 25 to 50-metre spacing. Goldseek's President & CEO Jon Deluce states, “We are very excited to announce this exceptional intercept (BE-21-02) supporting the potential of a strong maiden resource targeted for 2022. We believe these first infill-focused holes were a success hitting gold in each hole, proving the continuity and predictability of the B-14 structure. Additionally, results obtained from hole BE-21-04 represent expansion potential through extending the Central Shallow Zone to the east in an area with limited historical drilling. We look forward to the remainder of the results, including three 100–200-meter extension/step-out holes on the East Zone, which continue to hit the mineralized zone with favorable indicators observed over intervals similar to previous holes. As we continue to process and report results, we are starting to plan our follow-up winter drill program.” Mineralization Upper Limit Holes BE-21-01...