Business
Goldseek Resources Intersects 0.96 g/t Gold over 19.9 Metres in East Zone Extension at Beschefer
Highlights: 0.96 g/t gold over 19.9 metres,including 1.56 g/t gold over 7.0 metres, in a 90-metre north-east step-out hole in an area of limited historical dril

About this update from Abitibi Metals Corp
[{"type":"text","content":"Highlights: 0.96 g/t gold over 19.9 metres,including 1.56 g/t gold over 7.0 metres, in a 90-metre north-east step-out hole in an area of limited historical drilling.Between 30 and 200 metres of finely disseminated chalcopyrite in these three step-out holes supporting copper potential with base metal results still outstanding. Final rushed intervals completed during Goldseek’s maiden 5,000-metre program 15 of 17 holes returned gold values highlighted by 4.92 g/t gold over 28.65 metres (141 Metal Factor),including 11.39 g/t gold over 9.1 metres, the 2nd best intercept on the Property to date in terms of grade and thickness (BE-21-02). A follow-up drill program is being planned, and commencement is targeted for late January November 25, 2021 - TheNewswire - London, Ontario – Goldseek Resources Inc. (CNSX:GSK.CN) (FSE:4KG) (OTC:GSKKF) (“Goldseek” or the “Company”) is pleased to announce results from the final three drill holes at the Beschefer Project, located approximately 30 kilometres southwest of Wallbridge Mining Company Limited’s (“Wallbridge”) Fenelon Gold Project on the Detour Gold Trend. BE-21-14 intersected 0.96 g/t gold over 19.9 metres, including 1.56 g/t gold over 7.0 metres, encountered in a 90-metre step-out hole in the East Zone. FIGURE 1 - BESCHEFER ZONE LONG SECTION The drill grid was designed to validate and extend the modelled Central Shallow Zone and East Zone, covering approximately 700 metres of strike length following a general north-east trend. The mineralization extends from the bedrock interface down to a vertical depth of about 200 metres. The target structure dips at 40° to the southeast. Holes reported aimed at finding the extension to the northeast at an average distance of 100 metres using three holes, BES-21-12 to BES-21-14, totalling 1,050 metres and forming a staggered fence. The program has successfully identified a possible robust extension to the mineralized system following a trend that can be evaluated at N060 degrees based on gold grade and lithological correlations. The historical drill coverage going eastward is nearly absent, possibly due to the lack of clear geophysical signals. Goldseek's President & CEO Jon Deluce states, “We are very excited to announce these final extension holes from our maiden 5,000-metre program at Beschefer. BE-21-14 extends the East...