Business

Abitibi Metals Expands Mid-Level High-Grade Copper Zones at B26: 4.8% CuEq Over 4.1m within 63.2m at 1% CuEq

Abitibi Metals Corp. (CSE: AMQ) (OTCQB: AMQFF) (FSE: FW0) ("Abitibi" or the "Company") is pleased to announce it has received assay results from the four holes completed before breakup as part of its Phase III drill program at the B26 Polymetallic Deposit ("B26", the "Project" or the "Deposit"). To date, a total of 2,522 meters have been drilled as part of 20,000-meters Phase III program. The remaining 17,500 metres are set to commence with all necessary permits received and both equipment and t

articleAbitibi Metals CorpJune 24, 20259/company/abitibi-metals/news/abitibi-metals-expands-mid-level-110000465
Abitibi Metals Expands Mid-Level High-Grade Copper Zones at B26: 4.8% CuEq Over 4.1m within 63.2m at 1% CuEq

About this update from Abitibi Metals Corp

[{"type":"text","content":"Highlights:","length":11,"tagName":"p"},{"type":"list","items":[{"val":[{"type":"text","content":"Results from targeted drilling which expanded high-grade areas of the B26 Deposit: ","length":82,"tagName":"p"},{"type":"list","items":[{"val":[{"type":"text","content":"Hole 1274-25-363 – 1% CuEq over 63.2 metres beginning at 412.3 metres depth, including 4.8% CuEq over 4.1 metres beginning at 455.5 metres depth.","length":150,"tagName":"p"}]},{"val":[{"type":"text","content":"Hole 1274-25-365 – 2.13% CuEq over 11 metres beginning at 507.2 metres depth.","length":82,"tagName":"p"}]},{"val":[{"type":"text","content":"Hole 1274-25-366 – 1.84% CuEq over 29.6 metres beginning at 546 metres depth, including 3.38% CuEq over 8.3 metres.","length":120,"tagName":"p"}]},{"val":[{"type":"text","content":"Positive impact on B26 Resource Growth Potential – Holes intercepted higher-grade mineralization both within and beyond the current interpreted block model (see figures 3, 4 & 5), encountering >2% CuEq mineralization in areas previously modeled at 1–1.5% CuEq.","length":272,"tagName":"p"}]}],"tagName":"ul","bulletedList":true,"length":624,"olType":false}]}],"tagName":"ul","bulletedList":true,"length":706,"olType":false},{"type":"text","content":"LONDON, ON, June 24, 2025 /CNW/ - Abitibi Metals Corp. (CSE: AMQ) (OTCQB: AMQFF) (FSE: FW0) ("Abitibi" or the "Company") is pleased to announce it has received assay results from the four holes completed before breakup as part of its Phase III drill program at the B26 Polymetallic Deposit ("B26", the "Project" or the "Deposit"). To date, a total of 2,522 meters have been drilled as part of 20,000-meters Phase III program. The remaining 17,500 metres are set to commence with all necessary permits received and both equipment and technical crews (including technicians and drillers) already mobilized on site. Details of the program were announced last week (see news release dated June 18, Abitibi Metals Announces Phase 3 Drill Strategy and Growth Model Potential). The Company currently owns 50% of the B26 Deposit and retains the option to earn an additional 30% from SOQUEM Inc. ("SOQUEM"), a subsidiary of Investissement Québec (see news release dated November 16, 2023).","length":1040,"tagName":"p"},{"type":"text","cont...

More updates from Abitibi Metals Corp

block modelAbitibimineralizationAbitibi Metals CorpThe CompanySOQUEM