Business
Abcourt Mines Presents Results Update of the Underground Diamond Drilling Campaign at Sleeping Giant Mine
ROUYN-NORANDA, Quebec, July 09, 2024 (GLOBE NEWSWIRE) -- Abcourt Mines Inc. (“Abcourt” or the “Corporation”) (TSX Venture: ABI) (OTCQB: ABMBF) is pleased to pre

About this update from Abcourt Mines, Inc. Class B
[{"type":"text","content":" ROUYN-NORANDA, Quebec, July 09, 2024 (GLOBE NEWSWIRE) -- Abcourt Mines Inc. (“Abcourt” or the “Corporation”) (TSX Venture: ABI) (OTCQB: ABMBF) is pleased to present an update on the results of the underground diamond drilling campaign at Sleeping Giant mine. From December 2023 until June 30, 2024, Abcourt has carried out, from levels 235 and 295, 27 drilling holes totaling 3,074 meters in the DAC 5 area. Among these 27 holes, 20 holes totaling 2,457 meters were drilled in the DAC 5 area. Abcourt presents the results of 13 drill holes totaling 1,554 meters drilled underground in the DAC 5 area from level 235. The highlights of the analysis results, included in this press release, are as follows: 19.41 g/t Au over 0.5 meter in hole 23-473, 14.72 g/t Au over 0.6 meter in hole 23-483, 8.73 g/t Au over 2.1 meters and 19.93 g/t Au over 0.5 meter in hole 23-484. The main results of holes drilled from level 235 are displayed in table 1. Table 1: Main Underground Drilling Results from the DAC 5 Site Drill Hole From To Interval Au Vein (m) (m) (m) (g/t) 23-472 107.50 108.00 0.50 15.01 Vein 2 - West Extension 23-473 81.00 81.50 0.50 19.41 Vein 1 HW - Top of the Stope 23-474 101.20 101.70 0.50 7.06 Vein 2 - West Extension- Top of the Stope and 111.00 112.00 1.00 6.59 Vein 3 - West Extension- Top of the Stope 23-475 105.25 106.10 0.85 9.39 Vein 2 - West Extension- Top of the Stope 23-476 No significant results Top of the Stope 23-477 48.50 49.50 1.00 10.51 Vein 4 23-478 No significant results Vein 4 23-479 No significant results West Extension- Top of the Stope 23-480 No significant results West Extension- Top of the Stope 23-481 80.5 81.00 0.50 8.97 Vein 1- HW 23-482 No significant results Central Part - Top of the Stope 23-483 123.50 124.10 0.60 14.72 Vein 3 - West Extension 23-484 111.90 114 2.10 8.73 Vein 2 - West Extension Including 113.00 114.00 1.00 11.13 and 121.00 121.50 0.50 19.93 Vein 3 - West Extension Notes: 1. The length represents the length measured along the drill core. 2. Assay results are not capped, but higher-grade sub-intervals are highlighted. The main results of the holes drilled from the 235 level are shown in plan view (Figure 1) and longitudinal section (figure 2). Figure 1: DAC 5 Area, Level 235 and Sub-level 2, P...