Business
Abcourt Mines intersects 1.7 g/t gold over 12 metres including 15.2 g/t gold over 1 metre in drilling on its Flordin property, in the eastern extension of the Cartwright stripping
ROUYN-NORANDA, Quebec, April 27, 2026 (GLOBE NEWSWIRE) -- Abcourt Mines Inc. ("Abcourt" or the "Company") (TSX Venture: ABI) (OTCQB: ABMBF) is pleased to

About this update from Abcourt Mines, Inc. Class B
[{"type":"text","content":" ROUYN-NORANDA, Quebec, April 27, 2026 (GLOBE NEWSWIRE) -- Abcourt Mines Inc. (\"Abcourt\" or the \"Company\") (TSX Venture: ABI) (OTCQB: ABMBF) is pleased to announce that it has completed all drilling east of the Cartwright stripping to the boundary of its Flordin property and the Kinebik property now owned by Vior Gold Corporation (see Figure 2). Eleven (11) holes were drilled on two NW-SE lines for a total of 2,960 metres. As of today, 3,900 metres of drilling have been completed during the 2026 drilling campaign, which totals 20,000 metres. The next area to be drilled is located 300 metres west of the Cartwright stripping. Four (4) holes will test the lateral and depth extensions of stripping no 25-02 (9.5 g/t gold over 7 metres including 112.7 g/t gold over 0.5 metres) and no 25-01 (1.4 g/t gold over 4.0 metres). See press release dated September 25, 2025. Summary of Drilling Completed in the East part of the Property New drilling in the eastern sector of the property extended the known mineralized zones to the boundary of our Flordin property with the Kinebik property. All the drill hole intersected gold values. Hole FL-26-291 returned 1.7 g/t gold over 12 metres, including 15.2 g/t gold over 1 metre, within 50 metres of our property boundary. Based on geological observations and assay results, we can confirm that despite the continuity of the structure, mineralization, alteration and gold grades are less significant east of the Cartwright stripping than to the west. See Table 1 for a summary of the eastern sector drill results. With the eastern holes completed, the 2026 campaign will move westward and attempt to link the mineralized zones of stripping 25-01 and 25-02 with the holes drilled in 2023, to finally end in the South Zone area. With the 2026 drilling rate reached and steady, we expect to drill no less than 2,000 metres per month, with only one drill rig in operation. Table 1 : Table of drill results east of Cartwright stripping Hole# From (m) To (m) Length (m) Grade (g/t) FL-26-287 62 67 5.0 0.7 including 62 63 1.0 1.6 FL-26-288 67 73.5 6.5 0.7 92 95 3.0 3.0 including 92 93 1.0 4.8 FL-26-289 80 84 4.0 2.6 95 102 7.0 0.5 FL-26-290 100 107 7.0 0.8 including 100 103 3.0 1.7 137 138...