Business

Abcourt Announces Non-Published 2014 Diamond Drilling Results at the Sleeping Giant Mine

(via TheNewswire) Mont-St-Hilaire, Quebec / TheNewswire / September 25 , 2...

articleAbcourt Mines, Inc. Class BSeptember 25, 20174/company/abcourt-mines-inc/news/abcourt-announces-non-published-2014-diamond-drilling-results-at-the-sleeping-giant-mine
Abcourt Announces Non-Published 2014 Diamond Drilling Results at the Sleeping Giant Mine

About this update from Abcourt Mines, Inc. Class B

[{"type":"text","content":"Abcourt Announces Non-Published 2014 Diamond Drilling Results at the Sleeping Giant Mine(via TheNewswire)\n \n \nMont-St-Hilaire, Quebec / TheNewswire / September 25, 2017 - Mr. Renaud Hinse, President and Chief Executive Officer of Abcourt Mines Inc. (TSX-V: ABI, Berlin: AML-BE and Frankfurt Stock Exchanges: AML-FF) (\"Abcourt\" or the \"Company\") announces that a review of available documents at the Sleeping Giant mine indicates that more than fifty (50) underground holes were drilled after the last Press Release by Aurbec Mines Inc on May 26, 2014.\n\n\n \nFourteen (14) of these holes cut high gold values. These intersections grading more than five grams of gold per tonne over an orthogonal thickness of 1.6 meter gave a non-cut average of 14.45 grams of gold per tonne.\n\n\n \nThese holes were drilled under the supervision of Denis Desjardins, geologist who at that time worked for Mines Aurbec and who is currently working for Abcourt Mines Inc. Mr. Desjardins is a qualified person according to NI 43-101. Here is a table of results:\n\n\n \n\n\n\nClick Image To View Full Size\n\n\n\n \n \nQualified Persons and Quality Control and Quality Assurance Protocols\n\n\n \nValere Larouche, Ing., was on-site manager, and Denis Desjardins, P.Geo., was responsible for design and conduct of the exploration program in 2013-2014. Both professionnals were employees of Aurbec at the time of the drilling campaign. Forages M. Rouillier Inc. was the diamond drill contractor. Denis Desjardins is senior geologist working now for Mines Abcourt inc., at the Sleeping Giant site. \n\n\n \nThis press release reports un-cut core length assays, as indicated previously, with an estimation of a minimum orthogonal width of 1.6 meter.\n\n\n \nDiamond drill core samples are split, with half returned to the core box and the other half bagged, tagged and submitted to Aurbec's on-site assay laboratory at the Sleeping Giant Mine. Aurbec's laboratory is neither independent nor accredited. Quality control and quality assurance protocols include insertion of blanks, duplicates and standards to monitor laboratory accuracy and precision. Aurbec also submits pulps to AGAT Laboratories or ALS Global Geochemistry Laboratories for independent and ISO accredited duplicate assays. Batches that fail QA/QC protocol are rerun. Unaccredited assays are used in weighted average ...

More updates from Abcourt Mines, Inc. Class B