<?xml version="1.0" encoding="UTF-8"?>
<rss version="2.0" xmlns:atom="http://www.w3.org/2005/Atom">
  <channel>
    <title>Subsea 7 S.a. — News on 6ix</title>
    <link>https://6ix.com/company/subsea-7-sa</link>
    <description>Latest news and press releases for Subsea 7 S.a. on 6ix.</description>
    <language>en-us</language>
    <lastBuildDate>Thu, 09 Apr 2026 19:12:00 GMT</lastBuildDate>
    <generator>6ix RSS</generator>
    <atom:link href="https://6ix.com/rss/company/subsea-7-sa" rel="self" type="application/rss+xml" />
    <image>
      <url>https://6ix-events-pro.s3.amazonaws.com/6ixvideo/logos/org-logo6836221678dffbe2df141e17.webp</url>
      <title>Subsea 7 S.a.</title>
      <link>https://6ix.com/company/subsea-7-sa</link>
    </image>
    <item>
      <title>Subsea7 awarded offshore contract for Sépia 2 in Brazil</title>
      <link>https://6ix.com/company/subsea-7-sa/news/subsea7-awarded-offshore-contract-for-sepia-2-in-brazil-1</link>
      <guid isPermaLink="true">https://6ix.com/company/subsea-7-sa/news/subsea7-awarded-offshore-contract-for-sepia-2-in-brazil-1</guid>
      <pubDate>Thu, 09 Apr 2026 19:12:00 GMT</pubDate>
      <description>Luxembourg – 9 April 2026 - Subsea 7 S.A. (Oslo Børs: SUBC, ADR: SUBCY) today announced the award of a supermajor contract 1 by Petrobras, following a competitive tender, for the development of the Sépia 2 field located approximately 280 kilometres southeast of Rio de Janeiro, Brazil, at a water depth of 2,170 metres in the pre-salt Santos Basin. Sépia 2 is one of the largest pre‑salt expansion phases, playing a central role in Brazil’s energy development. The contract scope includes engineering</description>
    </item>
    <item>
      <title>Subsea 7 S.A. - First quarter 2026 earnings call notification</title>
      <link>https://6ix.com/company/subsea-7-sa/news/subsea-7-sa-first-quarter-2026-earnings-call-notification</link>
      <guid isPermaLink="true">https://6ix.com/company/subsea-7-sa/news/subsea-7-sa-first-quarter-2026-earnings-call-notification</guid>
      <pubDate>Wed, 08 Apr 2026 09:00:00 GMT</pubDate>
      <description>Luxembourg – 8 April 2026 – Subsea 7 S.A. (Oslo Børs: SUBC, ADR: SUBCY) will publish its first quarter 2026 results for the period ended 31 March 2026 on Thursday 30 April 2026 at 08:00 CEST. A conference call and simultaneous webcast for the investment community will be held on Thursday 30 April 2026 at 11:00 BST / 12:00 CEST. From 08:00 CEST the results announcement and the presentation to be reviewed during the conference call and webcast will be available on the Subsea7 website: www.subsea7.</description>
    </item>
    <item>
      <title>Subsea7 and SLB OneSubsea Sign  Strategic Collaboration Agreement with PETRONAS Suriname</title>
      <link>https://6ix.com/company/subsea-7-sa/news/subsea7-and-slb-onesubsea-sign-strategic-collaboration-agreement-with-petronas-suriname-1</link>
      <guid isPermaLink="true">https://6ix.com/company/subsea-7-sa/news/subsea7-and-slb-onesubsea-sign-strategic-collaboration-agreement-with-petronas-suriname-1</guid>
      <pubDate>Tue, 07 Apr 2026 20:00:00 GMT</pubDate>
      <description>Luxembourg – 7 April 2026 – Subsea 7 S.A. (Oslo Børs: SUBC, ADR: SUBCY) today announced the signing of a strategic collaboration agreement between PETRONAS Suriname E&amp;P B.V. (“PETRONAS Suriname”), a subsidiary of PETRONAS and Subsea Integration Alliance (SIA), which comprises Subsea7 and SLB OneSubsea. The agreement creates a long-term framework for close collaboration on field development projects in Suriname. Through early engagement and integrated execution, the collaboration aims to simplify</description>
    </item>
    <item>
      <title>Subsea 7 - Awarded contract offshore Equatorial Guinea</title>
      <link>https://6ix.com/company/subsea-7-sa/news/subsea-7-awarded-contract-offshore-equatorial-guinea</link>
      <guid isPermaLink="true">https://6ix.com/company/subsea-7-sa/news/subsea-7-awarded-contract-offshore-equatorial-guinea</guid>
      <pubDate>Wed, 01 Apr 2026 12:15:00 GMT</pubDate>
      <description>Luxembourg – [01 April 2026] - Subsea 7 S.A. (Oslo Børs: SUBC, ADR: SUBCY) today announced the award of a substantial1 contract by Noble Energy EG Ltd (a Chevron Company) for the subsea installation scope on the Aseng Gas Monetisation Project, offshore Equatorial Guinea. The project involves a single-well tieback connecting Aseng field to the existing Alen platform. The scope of work covers the transport and installation of approximately 19 kilometres of rigid production flowline and 20 kilometr</description>
    </item>
    <item>
      <title>Subsea 7 S.A Notice of Annual General Meeting</title>
      <link>https://6ix.com/company/subsea-7-sa/news/subsea-7-sa-notice-of-annual-general-meeting</link>
      <guid isPermaLink="true">https://6ix.com/company/subsea-7-sa/news/subsea-7-sa-notice-of-annual-general-meeting</guid>
      <pubDate>Fri, 27 Mar 2026 09:30:00 GMT</pubDate>
      <description>Luxembourg – 27 March 2026 – Subsea 7 S.A. (Oslo Børs: SUBC, ADR: SUBCY) today published and distributed to eligible holders of Common Shares and American Depositary Receipts (“ADRs”) the Notice of Meeting and supporting materials for the Annual General Meeting of Shareholders (the “AGM”). The AGM is scheduled to take place at 15:00 (local time) on 12 May 2026 at the Company&apos;s registered office, 412F, Route d&apos;Esch, L-1471 Luxembourg. The holders of ADRs on record at the close of business on 31 M</description>
    </item>
    <item>
      <title>Subsea7 Annual Report 2025</title>
      <link>https://6ix.com/company/subsea-7-sa/news/subsea7-annual-report-2025</link>
      <guid isPermaLink="true">https://6ix.com/company/subsea-7-sa/news/subsea7-annual-report-2025</guid>
      <pubDate>Fri, 20 Mar 2026 09:30:00 GMT</pubDate>
      <description>Luxembourg – 20 March 2026 - Subsea 7 S.A. (Oslo Børs: SUBC, ADR: SUBCY) announced today the publication of the Annual Report containing the Consolidated Financial Statements for the Subsea7 Group and the Financial Statements of Subsea 7 S.A., the Parent Company, for the year ended 31 December 2025. The Annual Report - in PDF and European Single Electronic Format (ESEF) – is attached to this press release and also available on the Group&apos;s website, subsea7.com. ***********************************</description>
    </item>
    <item>
      <title>Subsea7 announces CEO succession</title>
      <link>https://6ix.com/company/subsea-7-sa/news/subsea7-announces-ceo-succession-15</link>
      <guid isPermaLink="true">https://6ix.com/company/subsea-7-sa/news/subsea7-announces-ceo-succession-15</guid>
      <pubDate>Tue, 03 Mar 2026 20:39:00 GMT</pubDate>
      <description>Luxembourg – 3 March 2026 - Subsea7 today announced that John Evans will retire from his position as CEO on the 30 June 2026 and will be succeeded from 1 July 2026 by Stuart Fitzgerald who is currently CEO of Seaway7, part of the Subsea7 Group. The Board will propose that John is appointed as a Director of the Company at the Annual General Meeting on 12 May 2026. John has worked for Subsea7 and its predecessor companies for 40 years. He was COO of Subsea7 for 14 years and has been CEO of Subsea7</description>
    </item>
    <item>
      <title>Subsea 7 S.A. Announces Fourth Quarter and Full Year 2025 Results</title>
      <link>https://6ix.com/company/subsea-7-sa/news/subsea-7-sa-announces-fourth-quarter-and-full-year-2025-results</link>
      <guid isPermaLink="true">https://6ix.com/company/subsea-7-sa/news/subsea-7-sa-announces-fourth-quarter-and-full-year-2025-results</guid>
      <pubDate>Thu, 26 Feb 2026 07:00:00 GMT</pubDate>
      <description>Luxembourg – 26 February 2026 – Subsea 7 S.A. (Oslo Børs: SUBC, ADR: SUBCY, ISIN: LU0075646355, the Company) announced today results of Subsea7 Group (the Group, Subsea7) for the fourth quarter and full year which ended 31 December 2025. Unless otherwise stated the comparative period is the full year which ended 31 December 2024. Highlights Fourth quarter Adjusted EBITDA of $477 million, up more than 50% on the prior year period, equating to a margin of 24%. Strong performances in both Subsea an</description>
    </item>
    <item>
      <title>Subsea7 awarded contract in the Mediterranean Sea</title>
      <link>https://6ix.com/company/subsea-7-sa/news/subsea7-awarded-contract-in-the-mediterranean-sea</link>
      <guid isPermaLink="true">https://6ix.com/company/subsea-7-sa/news/subsea7-awarded-contract-in-the-mediterranean-sea</guid>
      <pubDate>Mon, 09 Feb 2026 17:49:00 GMT</pubDate>
      <description>Luxembourg – 9 February 2026 - Subsea 7 S.A. (Oslo Børs: SUBC, ADR: SUBCY) today announced the award of a substantial1 contract by Chevron for subsea installation in the Eastern Mediterranean. Subsea7’s scope includes the transport and installation of approximately 17 kilometres of subsea flowlines and umbilicals. Project management and engineering will commence immediately and will be managed by Subsea7’s office in Paris, France. Offshore activities are expected to commence in Q1 2028. David Be</description>
    </item>
    <item>
      <title>Subsea7 awarded contract offshore US</title>
      <link>https://6ix.com/company/subsea-7-sa/news/subsea7-awarded-contract-offshore-us</link>
      <guid isPermaLink="true">https://6ix.com/company/subsea-7-sa/news/subsea7-awarded-contract-offshore-us</guid>
      <pubDate>Thu, 29 Jan 2026 17:41:00 GMT</pubDate>
      <description>Luxembourg – 29 January 2026 – Subsea 7 S.A. (Oslo Børs: SUBC, ADR: SUBCY) today announced the award of a sizeable1 contract by Shell for the Kaikias Waterflood project. The Kaikias field is a deepwater development in the Mars-Ursa Basin, approximately 210 kilometres off the Louisiana coast in the US. The scope of work includes the transportation and installation of a subsea umbilical, riser, and a rigid flowline in water depths of up to 1,650 metres. Project management and engineering activitie</description>
    </item>
    <item>
      <title>Subsea7 awarded contract offshore Germany</title>
      <link>https://6ix.com/company/subsea-7-sa/news/subsea7-awarded-contract-offshore-germany</link>
      <guid isPermaLink="true">https://6ix.com/company/subsea-7-sa/news/subsea7-awarded-contract-offshore-germany</guid>
      <pubDate>Thu, 29 Jan 2026 16:50:00 GMT</pubDate>
      <description>Luxembourg – 29 January 2026 - Subsea 7 S.A. (Oslo Børs: SUBC, ADR: SUBCY) today announced the award to Seaway7, part of the Subsea7 Group, of a substantial1 contract by OWP Gennaker, part of Skyborn Renewables, for the Gennaker offshore wind farm in Germany. Seaway7’s scope of work includes the transportation and installation of the 63 monopiles and transition pieces. Offshore activities are expected to commence in 2027. Stuart Fitzgerald, Seaway7’s CEO, said: “Seaway7 has a strong track record</description>
    </item>
    <item>
      <title>Subsea 7 S.A. - Fourth quarter 2025 earnings call notification</title>
      <link>https://6ix.com/company/subsea-7-sa/news/subsea-7-sa-fourth-quarter-2025-earnings-call-notification</link>
      <guid isPermaLink="true">https://6ix.com/company/subsea-7-sa/news/subsea-7-sa-fourth-quarter-2025-earnings-call-notification</guid>
      <pubDate>Mon, 26 Jan 2026 10:09:00 GMT</pubDate>
      <description>Luxembourg – 26 January 2026 – Subsea 7 S.A. (Oslo Børs: SUBC, ADR: SUBCY) will publish its fourth quarter 2025 results for the period ended 31 December 2025 on Thursday 26 February 2026 at 07:00 UK / 08:00 CET. A conference call and simultaneous webcast for the investment community will be held on Thursday 26 February 2026 at 11:00 UK / 12:00 CET. From 07:00 UK / 08:00 CET the results announcement and the presentation to be reviewed during the conference call and webcast will be available on th</description>
    </item>
    <item>
      <title>Subsea 7 - Confirms award offshore Norway</title>
      <link>https://6ix.com/company/subsea-7-sa/news/subsea-7-confirms-award-offshore-norway</link>
      <guid isPermaLink="true">https://6ix.com/company/subsea-7-sa/news/subsea-7-confirms-award-offshore-norway</guid>
      <pubDate>Fri, 19 Dec 2025 14:00:00 GMT</pubDate>
      <description>Luxembourg – 19 December 2025 – Subsea 7 S.A. (Oslo Børs: SUBC, ADR: SUBCY) today announced the award of a sizeable1 contract for pre-commitment to procure long lead items for a project in the Norwegian North Sea.Pre-execution project management and engineering work will commence immediately at Subsea7’s office in Stavanger, Norway. Erik Femsteinevik, VP Subsea7 Norway, said: “This early commitment to long lead items reflects the strong, trust‑based relationship with the operator and enables ear</description>
    </item>
    <item>
      <title>Subsea 7 - awarded contract offshore Norway</title>
      <link>https://6ix.com/company/subsea-7-sa/news/subsea-7-awarded-contract-offshore-norway</link>
      <guid isPermaLink="true">https://6ix.com/company/subsea-7-sa/news/subsea-7-awarded-contract-offshore-norway</guid>
      <pubDate>Fri, 19 Dec 2025 11:30:00 GMT</pubDate>
      <description>Luxembourg – 19 December 2025 – Subsea 7 S.A. (Oslo Børs: SUBC, ADR: SUBCY) today announced the award of a sizeable1 extension of an existing frame agreement by Equinor for subsea inspection, maintenance and repair services (IMR), for vessel Seven Viking. This is the latest extension to the frame agreement, first signed in 2018. Under the terms of the extension, to the end of 2027, Seven Viking will carry out inspection, maintenance and repair (IMR) services for subsea operations at Equinor’s oi</description>
    </item>
    <item>
      <title>Subsea 7 - Awarded contract offshore Australia</title>
      <link>https://6ix.com/company/subsea-7-sa/news/subsea-7-awarded-contract-offshore-australia</link>
      <guid isPermaLink="true">https://6ix.com/company/subsea-7-sa/news/subsea-7-awarded-contract-offshore-australia</guid>
      <pubDate>Tue, 16 Dec 2025 11:00:00 GMT</pubDate>
      <description>Luxembourg –16 December 2025 - Subsea 7 S.A. (Oslo Børs: SUBC, ADR: SUBCY) today announced a substantial1 award by Chevron Australia. The contract covers subsea installation on the Gorgon Stage 3 (GS3) Project, offshore Australia. Subsea7’s scope of work includes project management, engineering, procurement, fabrication, transportation, installation and pre-commissioning of subsea equipment and associated infrastructure at GS3, at 1,350m water depth. Project management and engineering work will</description>
    </item>
    <item>
      <title>Subsea 7 S.A. Financial Calendar</title>
      <link>https://6ix.com/company/subsea-7-sa/news/subsea-7-sa-financial-calendar</link>
      <guid isPermaLink="true">https://6ix.com/company/subsea-7-sa/news/subsea-7-sa-financial-calendar</guid>
      <pubDate>Fri, 12 Dec 2025 15:08:00 GMT</pubDate>
      <description>Luxembourg – 12 December 2025 – Subsea 7 S.A. (Oslo Børs: SUBC, ADR: SUBCY) announced today its financial calendar for 2026. Results for the financial year to 31 December 2025 26 February 2026 – Quarterly report (Q4) 20 March 2026 – Annual report for 2025 Results for the financial year to 31 December 2026 30 April 2026 – Quarterly report (Q1) 12 May 2026 – Annual General Meeting 30 July 2026 – Half-yearly report and quarterly report (Q2) 19 November 2026 – Quarterly report (Q3) *****************</description>
    </item>
    <item>
      <title>Subsea7 Related Party Transaction</title>
      <link>https://6ix.com/company/subsea-7-sa/news/subsea7-related-party-transaction</link>
      <guid isPermaLink="true">https://6ix.com/company/subsea-7-sa/news/subsea7-related-party-transaction</guid>
      <pubDate>Fri, 12 Dec 2025 14:14:00 GMT</pubDate>
      <description>Luxembourg – 12 December 2025 - Subsea 7 S.A. (Oslo Børs: SUBC, ADR: SUBCY) today announced that, its Board of Directors has agreed to reimburse Siem Industries S.A. for certain legal costs in relation to the proposed merger of Subsea7 S.A. with Saipem S.p.A. The total value of the reimbursement is under $1 million and covers legal work relating to the Shareholders’ Agreement dated 23 July 2025 entered into between Eni S.p.A., CDP Equity S.p.A. and Siem Industries S.A. and ongoing support in rel</description>
    </item>
    <item>
      <title>Subsea7 awarded contract offshore for BC-Wind project in Poland</title>
      <link>https://6ix.com/company/subsea-7-sa/news/subsea7-awarded-contract-offshore-for-bc-wind-project-in-poland</link>
      <guid isPermaLink="true">https://6ix.com/company/subsea-7-sa/news/subsea7-awarded-contract-offshore-for-bc-wind-project-in-poland</guid>
      <pubDate>Mon, 08 Dec 2025 13:08:00 GMT</pubDate>
      <description>Luxembourg – 8 December 2025 - Subsea 7 S.A. (Oslo Børs: SUBC, ADR: SUBCY) today announced the award to Seaway7, part of the Subsea7 Group, of a sizeable contract by Ocean Winds for the BC-Wind project. The BC-Wind offshore site is located in the Baltic Sea, approx. 23 kilometres off the Polish coast, and will comprise 26 wind turbine generators. Seaway7’s scope of work includes the transport and installation of 26 transition pieces and an offshore substation with offshore activity expected to c</description>
    </item>
    <item>
      <title>Subsea7 awarded contract offshore UK</title>
      <link>https://6ix.com/company/subsea-7-sa/news/subsea7-awarded-contract-offshore-uk</link>
      <guid isPermaLink="true">https://6ix.com/company/subsea-7-sa/news/subsea7-awarded-contract-offshore-uk</guid>
      <pubDate>Mon, 01 Dec 2025 07:00:00 GMT</pubDate>
      <description>Luxembourg – 1 December 2025 - Subsea 7 S.A. (Oslo Børs: SUBC, ADR: SUBCY) today announced the award of a sizeable1 contract by Ithaca Energy, for the provision of off-station decommissioning services for the Alba Floating Storage Unit and Greater Stella field FPF-1 production facility, approximately 230 kilometres east of Aberdeen. This decommissioning scope includes the flushing of the subsea pipelines, provision of diver support vessel services, and seabed clearance. Project management and en</description>
    </item>
    <item>
      <title>Subsea 7 S.A. Announces Third Quarter 2025 Results</title>
      <link>https://6ix.com/company/subsea-7-sa/news/subsea-7-sa-announces-third-quarter-2025-results</link>
      <guid isPermaLink="true">https://6ix.com/company/subsea-7-sa/news/subsea-7-sa-announces-third-quarter-2025-results</guid>
      <pubDate>Thu, 20 Nov 2025 07:00:00 GMT</pubDate>
      <description>Luxembourg – 20 November 2025 – Subsea 7 S.A. (Oslo Børs: SUBC, ADR: SUBCY, ISIN: LU0075646355, the Company) announced today results of Subsea7 Group (the Group, Subsea7) for the third quarter which ended 30 September 2025. Highlights Third quarter Adjusted EBITDA of $407 million, up 27% on the prior year period, equating to a margin of 22%Solid operational and financial performance from both Subsea and Conventional and Renewables, with Adjusted EBITDA margins of 24% and 17%, respectivelyFull ye</description>
    </item>
  </channel>
</rss>