<?xml version="1.0" encoding="UTF-8"?>
<rss version="2.0" xmlns:atom="http://www.w3.org/2005/Atom">
  <channel>
    <title>Itm Power — News on 6ix</title>
    <link>https://6ix.com/company/itm-power</link>
    <description>Latest news and press releases for Itm Power on 6ix.</description>
    <language>en-us</language>
    <lastBuildDate>Fri, 17 Apr 2026 06:00:00 GMT</lastBuildDate>
    <generator>6ix RSS</generator>
    <atom:link href="https://6ix.com/rss/company/itm-power" rel="self" type="application/rss+xml" />
    <image>
      <url>https://6ix-events-pro.s3.amazonaws.com/6ixvideo/logos/org-logo6835e68678dffbe2df128a08.webp</url>
      <title>Itm Power</title>
      <link>https://6ix.com/company/itm-power</link>
    </image>
    <item>
      <title>Strategic collaboration with Rheinmetall</title>
      <link>https://6ix.com/company/itm-power/news/strategic-collaboration-with-rheinmetall</link>
      <guid isPermaLink="true">https://6ix.com/company/itm-power/news/strategic-collaboration-with-rheinmetall</guid>
      <pubDate>Fri, 17 Apr 2026 06:00:00 GMT</pubDate>
      <description>ITM Power plc has announced a strategic collaboration with Rheinmetall AG to support Rheinmetall&apos;s Giga PtX project, which aims to establish a Europe-wide network of decentralized synthetic fuel production plants for NATO armed forces. This project involves deploying hundreds of plants, each with up to 50 MW of electrolysis capacity, capable of producing 5,000 to 7,000 tonnes of e-fuel annually per facility, thereby strengthening defense energy resilience and sovereign fuel capability. The colla</description>
    </item>
    <item>
      <title>GB Energy 40m investment and DESNZ 46.5m grant</title>
      <link>https://6ix.com/company/itm-power/news/gb-energy-40m-investment-and-desnz-465m-grant</link>
      <guid isPermaLink="true">https://6ix.com/company/itm-power/news/gb-energy-40m-investment-and-desnz-465m-grant</guid>
      <pubDate>Thu, 09 Apr 2026 06:00:00 GMT</pubDate>
      <description>ITM Power plc has secured a significant £40 million investment from Great British Energy and a £46.5 million grant from the Department for Energy Security and Net Zero to establish a 1 GW Chronos electrolyser manufacturing line in the UK. This funding will support the development and operational capability for their next-generation Chronos technology, which promises superior energy efficiency and lower costs. The company has also improved its FY26 cash guidance to between £210 million and £215 m</description>
    </item>
    <item>
      <title>MorGen Energy 20 MW Project FID and LTSA Signed</title>
      <link>https://6ix.com/company/itm-power/news/morgen-energy-20-mw-project-fid-and-ltsa-signed</link>
      <guid isPermaLink="true">https://6ix.com/company/itm-power/news/morgen-energy-20-mw-project-fid-and-ltsa-signed</guid>
      <pubDate>Wed, 11 Mar 2026 07:00:00 GMT</pubDate>
      <description>ITM Power plc has announced that MorGen Energy&apos;s 20 MW West Wales Hydrogen project in Milford Haven has reached Final Investment Decision (FID), making it one of the first UK Government HAR1 funded projects to do so. ITM Power will supply its 20 MW POSEIDON electrolysis module for the plant, which is expected to produce approximately 2,000 tonnes of hydrogen annually and commence commissioning in 2028, serving industrial clusters across Wales. Additionally, ITM Power has secured a ten-year Long-</description>
    </item>
    <item>
      <title>FY26 revenue guidance raised</title>
      <link>https://6ix.com/company/itm-power/news/fy26-revenue-guidance-raised</link>
      <guid isPermaLink="true">https://6ix.com/company/itm-power/news/fy26-revenue-guidance-raised</guid>
      <pubDate>Tue, 17 Feb 2026 07:00:00 GMT</pubDate>
      <description>ITM Power PLC has raised its full-year 2026 revenue guidance by over 10%, now expecting between £40 million and £43 million, an 11% midpoint increase from the previous £35 million to £40 million range. This upward revision is attributed to strong project progress and the adoption of the percentage-of-completion method, which allows for progressive revenue recognition, as well as contributions from recently secured contracts. Adjusted EBITDA and cash guidance remain unchanged.
                Dis</description>
    </item>
    <item>
      <title>20MW contract FID</title>
      <link>https://6ix.com/company/itm-power/news/20mw-contract-fid</link>
      <guid isPermaLink="true">https://6ix.com/company/itm-power/news/20mw-contract-fid</guid>
      <pubDate>Mon, 16 Feb 2026 07:00:00 GMT</pubDate>
      <description>ITM Power plc has received a Notice to Proceed for a 20MW project following the customer&apos;s Final Investment Decision, officially commencing the contract and adding it to the company&apos;s contracted order backlog. The company anticipates sharing further project specifics by the end of the first quarter of 2026.
                Disclaimer*</description>
    </item>
    <item>
      <title>Half-year Financial Report</title>
      <link>https://6ix.com/company/itm-power/news/half-year-financial-report</link>
      <guid isPermaLink="true">https://6ix.com/company/itm-power/news/half-year-financial-report</guid>
      <pubDate>Thu, 29 Jan 2026 07:00:00 GMT</pubDate>
      <description>ITM Power PLC reported interim results for the six months ending October 31, 2025, showing revenue increased to £18.0 million from £15.5 million in the prior year, while the adjusted EBITDA loss narrowed to £11.9 million from £16.8 million. The company maintained a strong cash position of £197.8 million, down slightly from £203.1 million a year prior. The contract backlog has significantly grown to £152 million, with 71% of contracts now profitable. ITM Power reiterated its full-year guidance fo</description>
    </item>
    <item>
      <title>Notice of Interim Results</title>
      <link>https://6ix.com/company/itm-power/news/notice-of-interim-results-7</link>
      <guid isPermaLink="true">https://6ix.com/company/itm-power/news/notice-of-interim-results-7</guid>
      <pubDate>Tue, 20 Jan 2026 07:00:00 GMT</pubDate>
      <description>ITM Power PLC has announced that its interim results for the six months ending 31 October 2025 will be released on Thursday, 29 January 2026. The company&apos;s CEO, CFO, and CTO will present these results to analysts and investors at 9:00 am on the same day, with the presentation accessible to all shareholders. Investors can submit questions in advance via their Investor Meet Company dashboard until 9:00 am on 28 January 2026.
                Disclaimer*</description>
    </item>
    <item>
      <title>Director/PDMR Shareholding</title>
      <link>https://6ix.com/company/itm-power/news/directorpdmr-shareholding-57</link>
      <guid isPermaLink="true">https://6ix.com/company/itm-power/news/directorpdmr-shareholding-57</guid>
      <pubDate>Mon, 19 Jan 2026 07:00:00 GMT</pubDate>
      <description>ITM Power plc has announced that its Chief Technology Officer, Simon Bourne, and Chief Executive Officer, Dennis Schulz, have purchased ordinary shares under the company&apos;s Buy as You Earn Share Incentive Plan. Each executive acquired 227 partnership shares at £0.65989 per share, with the company matching these purchases on a one-for-one basis, resulting in a total of 454 shares for each PDMR. These transactions, which occurred on January 15, 2026, on the London Stock Exchange&apos;s AIM market, repre</description>
    </item>
    <item>
      <title>Appointment of new non-executive chairman</title>
      <link>https://6ix.com/company/itm-power/news/appointment-of-new-non-executive-chairman</link>
      <guid isPermaLink="true">https://6ix.com/company/itm-power/news/appointment-of-new-non-executive-chairman</guid>
      <pubDate>Fri, 16 Jan 2026 07:00:00 GMT</pubDate>
      <description>ITM Power plc announced that Jürgen Nowicki officially assumed the role of Non-Executive Chair on January 15, 2026, succeeding Sir Roger Bone who retired after a significant tenure. Nowicki&apos;s appointment, initially announced on June 25, 2025, is expected to bring valuable sector experience to the board as the company focuses on operational delivery and its growth strategy. The company expressed gratitude to Sir Roger Bone for his leadership during its transition to a commercial market leader in </description>
    </item>
    <item>
      <title>12.5MW contract with Octopus Energy Generation</title>
      <link>https://6ix.com/company/itm-power/news/125mw-contract-with-octopus-energy-generation</link>
      <guid isPermaLink="true">https://6ix.com/company/itm-power/news/125mw-contract-with-octopus-energy-generation</guid>
      <pubDate>Thu, 18 Dec 2025 07:00:00 GMT</pubDate>
      <description>ITM Power plc has secured a contract with Octopus Energy Generation to deploy its 12.5MW NEPTUNE V containerised green hydrogen systems at Kimberly-Clark&apos;s Northfleet manufacturing plant, aiming for operational status by the end of 2027. This project, financed by Octopus Energy Generation through its HYRO vehicle and supported by UK Government funding, will produce green hydrogen to decarbonise the paper-making process for Andrex® products by powering a new dual-fuel boiler system. This marks a </description>
    </item>
    <item>
      <title>Two engineering contracts signed</title>
      <link>https://6ix.com/company/itm-power/news/two-engineering-contracts-signed</link>
      <guid isPermaLink="true">https://6ix.com/company/itm-power/news/two-engineering-contracts-signed</guid>
      <pubDate>Fri, 12 Dec 2025 07:00:00 GMT</pubDate>
      <description>ITM Power plc has secured two engineering contracts, a Basic Design Engineering Package in Australia and a Front-End Engineering Design for a project in Canada, both utilizing its NEPTUNE V green hydrogen production plant. These combined contracts represent a total capacity of 70 MW, signaling expansion into new markets and the deployment of its leading technology for hydrogen production from renewable sources.
                Disclaimer*</description>
    </item>
    <item>
      <title>Trading update</title>
      <link>https://6ix.com/company/itm-power/news/trading-update-26</link>
      <guid isPermaLink="true">https://6ix.com/company/itm-power/news/trading-update-26</guid>
      <pubDate>Thu, 04 Dec 2025 07:00:00 GMT</pubDate>
      <description>ITM Power plc reported record first-half revenue of £18.0m for the six months ending 31 October 2025, alongside an adjusted EBITDA loss of £11.9m and a robust cash position of £197m. The company noted accelerating momentum in Europe, particularly Germany, and progress on key projects like the RWE Lingen plant, while acknowledging policy-driven uncertainty in the US. ITM Power maintained its FY26 guidance, expecting revenue between £35m and £40m, an adjusted EBITDA loss of £27m to £29m, and year-</description>
    </item>
    <item>
      <title>Selected for 710 MW of projects in Germany</title>
      <link>https://6ix.com/company/itm-power/news/selected-for-710-mw-of-projects-in-germany</link>
      <guid isPermaLink="true">https://6ix.com/company/itm-power/news/selected-for-710-mw-of-projects-in-germany</guid>
      <pubDate>Fri, 21 Nov 2025 07:00:00 GMT</pubDate>
      <description>ITM Power plc has been selected by Stablegrid Group as the technology partner for two significant energy infrastructure projects in Germany, collectively representing 710 MW of electrolyser capacity. The first project, &quot;Netzbrücke 410&quot; in Rüstringen, will utilize a 30 MW NEPTUNE V containerised electrolyser system, with a final investment decision expected in 2026. The second, larger project involves installing 680 MW of indoor electrolyser capacity, with pre-FEED work commencing in January 2026</description>
    </item>
    <item>
      <title>Launch of ALPHA 50</title>
      <link>https://6ix.com/company/itm-power/news/launch-of-alpha-50</link>
      <guid isPermaLink="true">https://6ix.com/company/itm-power/news/launch-of-alpha-50</guid>
      <pubDate>Tue, 21 Oct 2025 06:00:00 GMT</pubDate>
      <description>ITM Power PLC has launched ALPHA 50, a new 50MW full-scope green hydrogen plant. This plant is designed to be a global standard for scalable and cost-effective hydrogen production. The ALPHA 50 is fully skid-mounted, prefabricated, and standardized, consolidating central process units and offering redundancy for maximized uptime. Requiring only tap water and electricity, it provides high-purity hydrogen at 30 bar pressure. The full-scope plant is priced at €50 million, intended to be more compet</description>
    </item>
    <item>
      <title>Result of AGM</title>
      <link>https://6ix.com/company/itm-power/news/result-of-agm-39</link>
      <guid isPermaLink="true">https://6ix.com/company/itm-power/news/result-of-agm-39</guid>
      <pubDate>Thu, 09 Oct 2025 06:00:00 GMT</pubDate>
      <description>At ITM Power&apos;s Annual General Meeting on October 8, 2025, all resolutions were passed. BDO LLP was appointed as the company&apos;s auditor for the financial year ending April 30, 2026, replacing Grant Thornton LLP. Shareholders voted 156,509,165 for and 53,879 against the Annual Report and Accounts. The Directors&apos; Remuneration Report received 137,054,046 votes for and 19,476,065 against. Dr. Simon Bourne was re-elected with 154,824,427 votes for and 1,778,006 against. Sir Roger Bone was re-elected wi</description>
    </item>
    <item>
      <title>FEED contract for multi-unit NEPTUNE V project</title>
      <link>https://6ix.com/company/itm-power/news/feed-contract-for-multi-unit-neptune-v-project</link>
      <guid isPermaLink="true">https://6ix.com/company/itm-power/news/feed-contract-for-multi-unit-neptune-v-project</guid>
      <pubDate>Mon, 06 Oct 2025 06:00:00 GMT</pubDate>
      <description>ITM Power has signed a Front-End Engineering Design (FEED) contract for a project shortlisted in the UK&apos;s Hydrogen Allocation Round 2 (HAR2). The FEED contract is for multiple NEPTUNE V units, which are the company&apos;s 5MW containerised green hydrogen plants. The project is still subject to a Final Investment Decision (FID), with the customer anticipating the plant to be operational by 2028.

                Disclaimer*</description>
    </item>
    <item>
      <title>150MW NEPTUNE V capacity reservation with RWE</title>
      <link>https://6ix.com/company/itm-power/news/150mw-neptune-v-capacity-reservation-with-rwe</link>
      <guid isPermaLink="true">https://6ix.com/company/itm-power/news/150mw-neptune-v-capacity-reservation-with-rwe</guid>
      <pubDate>Mon, 22 Sep 2025 06:00:00 GMT</pubDate>
      <description>ITM Power announced a capacity reservation agreement with RWE for 150MW of NEPTUNE V units, equivalent to 30 units, with call-offs expected by 2027. This agreement builds upon RWE&apos;s existing operation of ITM Power&apos;s 4MW pilot plant and the ongoing delivery of 200MW of electrolysers for the GetH2 Nukleus project. The NEPTUNE V units represent ITM Power&apos;s latest generation containerised green hydrogen plant solution, designed for rapid deployment and simplified installation. The company plans to p</description>
    </item>
    <item>
      <title>Notice of AGM</title>
      <link>https://6ix.com/company/itm-power/news/notice-of-agm-6</link>
      <guid isPermaLink="true">https://6ix.com/company/itm-power/news/notice-of-agm-6</guid>
      <pubDate>Wed, 03 Sep 2025 06:00:00 GMT</pubDate>
      <description>ITM Power PLC announced that its 2025 Annual General Meeting will be held on Wednesday, October 8, 2025, at 10:00 am at 2 Bessemer Park, Sheffield. The company&apos;s Annual Report and Accounts for the year ended April 30, 2025, is now available for viewing. Both the Notice of AGM and the Annual Report are accessible online. Hard copies of these documents have been mailed to shareholders who requested them.

                Disclaimer*</description>
    </item>
    <item>
      <title>Strategic partnership with ABO Energy</title>
      <link>https://6ix.com/company/itm-power/news/strategic-partnership-with-abo-energy</link>
      <guid isPermaLink="true">https://6ix.com/company/itm-power/news/strategic-partnership-with-abo-energy</guid>
      <pubDate>Tue, 26 Aug 2025 06:00:00 GMT</pubDate>
      <description>ITM Power&apos;s new subsidiary, Hydropulse, has formed a strategic partnership with ABO Energy, an international renewable energy developer. The collaboration aims to develop decentralized hydrogen production units near end-user sites, focusing on locations like Spain and Finland due to low power prices. ABO Energy will contribute its project pipeline, which includes a multi-gigawatt hydrogen pipeline, and development expertise, while Hydropulse will build, own, and operate the hydrogen production f</description>
    </item>
    <item>
      <title>Preliminary Results</title>
      <link>https://6ix.com/company/itm-power/news/preliminary-results-4</link>
      <guid isPermaLink="true">https://6ix.com/company/itm-power/news/preliminary-results-4</guid>
      <pubDate>Thu, 14 Aug 2025 06:00:00 GMT</pubDate>
      <description>Preliminary Results.</description>
    </item>
  </channel>
</rss>